Construction Progress Documentation

Recurring aerial documentation for active job sites.

An active job site is one of the hardest things to communicate to people who are not on it. Project owners, financiers, and future bid clients want to see what is actually happening. Monthly aerial documentation answers that question with evidence rather than words. The same flight path, the same angles, every visit, stacked into a dated archive that shows the job from groundbreaking to certificate of occupancy.

The value of this documentation compounds over time. A single aerial visit is a snapshot. Six months of visits is a story. A complete project archive from start to finish has value for bid presentations, insurance documentation, and dispute resolution that single photos never provide. Contractors who document their work well look more professional, get better owner reviews, and have a visual portfolio that wins future work.

We run two site visits per month on the Construction Owner Update package and confirm the flight path before the first visit. Every subsequent visit follows the same angles from the same altitudes so progress is visually comparable across months. Monthly recap films are cut from each visit and delivered in an owner-ready format — something you can share at a progress meeting or email to a banker without any additional production work.

Why aerial

No ground-level walk communicates a job site the way overhead documentation does. Top-down views show cleared acreage, foundation progress, framing stages, and finished exteriors in a single frame. That perspective is what project owners, lenders, and future bid clients respond to.

What you get

Builders, contractors, excavation and demolition crews, developers, and commercial project owners.

  • A complete visual record from groundbreaking to project close
  • Monthly recap films ready to share at owner and financing meetings
  • A dated aerial archive that supports insurance claims and disputes
  • Documentation that strengthens bid credibility for future projects
  • A growing project archive without you managing a content project

When to commission

Start at the earliest active phase of the project. Documentation taken at groundbreaking or early excavation is the most valuable — you cannot go back and capture what was there before. The archive is only as complete as the starting date.

Not right for everyone

Survey-grade measurement, engineering documentation, LIDAR or topographic data, or projects that only need a single one-time shot rather than recurring coverage.

Questions about this service

  • How often are site visits scheduled?

    Construction Progress: Standard includes two visits per month. Construction Progress: Lite includes one visit per month. We recommend Standard for projects where meaningful progress happens weekly and owners are actively engaged. Lite is a fit for slower-moving projects or those with smaller documentation budgets.

  • What does a monthly recap film look like?

    A 30 to 60 second cut showing the month's most significant progress moments, set to simple music and exported as an MP4. No voiceover, no graphics package — just the footage, organized and edited. Designed to be shareable at a project meeting or by email without any additional work on your end.

  • What if there is no visible progress in a given month?

    We still fly. The dated archive has value regardless of visible change — it documents the state of the site at that point in time, which matters for insurance, lien waiver, and documentation purposes. We will note in the delivery if the visible change was minimal.

  • Can I add annotated overviews?

    Yes. Annotated site overviews (top-down photos with labeled zones, structures, or progress markers) are available as an add-on. These are particularly useful for communicating progress to non-technical stakeholders like project owners or investors who want to understand what they are looking at.

More questions? See the full FAQ or reach out directly.

Working policies

  • Weather reschedules included

    One weather reschedule is built in. We never deliver footage we wouldn’t put our name on.

  • One revision round included

    Edits land within the agreed deliverable count. Any additional rounds are spelled out in your proposal.

  • Clear, written terms up front

    Scope, schedule, and terms are confirmed in a written proposal before anything is booked. No surprises.

  • Standard commercial usage rights

    Full commercial usage of finished deliverables for your business. Resale, broadcast, and paid ad licensing quoted as add-ons.

  • Insurance certificates on request

    Commercial liability insurance carried on every shoot. We’ll send the COI before you ask.

Start the conversation

Ready to talk about construction?

Share a few details about the property, the goal, and the timeline. We respond within one business day with a recommended scope and a clear proposal.